/
Staff Data Search - جامعة الزقازيق
Staff Data Search
facebook
youtube
googleplus
twitter
zagazig
En
Personal Website
Curriculum Vitae
Hossameldien Hosny Mohamed Badie
Faculty Engineering - Department Construction and Utilities Engineering
Scientific degrees
BSc In NULL, [1987]
MSc In NULL, [1992]
PhD In NULL, [1997]
الحالة الوظيفية الحالية :
قائم بالعمل
Academic Jobs
معيد : 27/9/1987
Doctor Assisant : 29/11/1992
Doctor : 30/7/1997
Professor Assisant : 27/5/2008
Professor : 24/9/2013
Professor Emeritus : 22/7/2024
Publications
1 -
Optimum Organization Structure for Construction Projects (Management Tool for Selecting Organization in the Egyptian Construction Market) (2013).
2 -
Construction Claims Causes and Management Efficiency (2013).
3 -
(Effect of Inadequate Site Investigation on the Cost of Road Construction (Case Study (2012).
4 -
Effect of Re- Organization on the Performance of the Egyptian Economical Organization for Water and Waste water. (2013).
5 -
Evaluation of Change Management Efficiency of Construction Contractors (2013).
6 -
Assessment of the Expected Construction Company Net Profit Using Neural Network and Multiple Regression Models. (2013).
7 -
The Neural Network Model for Predicting the Financing Cost for Construction Projects. (2009).
8 -
A Neural Network Model for Construction Projects Site Overhead Cost Estimating in Egypt. (2011).
9 -
Selecting of A Suitable Contract Strategy for Construction Projects Using Artificial Neural Network Model. (2011).
10 -
Neural Network and Multiple Regression Models for Estimation of Production Rates in Excavation Operations. (2012).
11 -
Impact of Payment Delays on Contractors Performance in Egypt. (2012).
12 -
Assessment of the Expected Cost of Quality (COQ) in Construction Projects in Egypt Using Artificial Neural Network Model. (2012).
13 -
Assessment of Construction Materials Wastage Using Artificial Neural Network Model. (2012).
14 -
Forecasting Project Schedule Performance Using Probabilistic and Deterministic Models (2013).
15 -
Risk Factors in Construction Projects Cash-Flow Analysis (2014).
16 -
Analysis of Time and Cost Overruns in Educational Building Projects in Egypt. (2013).
17 -
Assessment of Construction Company Working Capital Using Neural Network and Multiple Regression Models (2013).
18 -
Modelling Excavation Operation in Building Projects - A Simulation Approach. (2012).
19 -
Time Contingency Assessment in Construction Projects in Egypt Using Artificial Neural Networks Model (2011).
20 -
Using Neural Networks to Assign the Maximum Capital Due Date for Construction Projects. (2010).
21 -
The neural network model for predicting the financing cost for construction projects (2009).
22 -
The neural network model for predicting the financing cost for construction projects (2009).
23 -
The neural network model for predicting the financing cost for construction projects (2009).
24 -
A Neural Network Model for Construction Projects Site Overhead Cost Estimating in Egypt (2011).
25 -
SELECTING A SUITABLE CONTRACT STRATEGY FOR CONSTRUCTION PROJECTS USING ARTIFICIAL NEURAL NETWORK MODEL (2011).
26 -
Assessment of the expected cost of quality (COQ) in construction projects in Egypt using artificial neural network model (2012).
27 -
Management of construction cost contingency covering upside and downside risks (2014).
28 -
Cost analysis of continuous flight auger piles construction in Egypt (2016).
29 -
Maximizing the economic value of irrigation water and achieving self sufficiency of main crops (2014).
30 -
Reducing Construction Disputes through Effective Claims Management (2014).
31 -
Development of a Safety Performance Index for Construction Projects in Egypt (2015).
32 -
Optimum Organizational Structure for Construction Projects (Management Tool of Selecting Organization in Egyptian Construction Market) (2013).
Research Area
A Neural Network Model for Construction Projects Site Overhead Cost Estimating in Egypt
Assessment of the expected cost of quality (COQ) in construction projects in Egypt using artificial neural network model
Cost analysis of continuous flight auger piles construction in Egypt
Development of a Safety Performance Index for Construction Projects in Egypt
Management of construction cost contingency covering upside and downside risks
Maximizing the economic value of irrigation water and achieving self sufficiency of main crops
Optimum Organizational Structure for Construction Projects (Management Tool of Selecting Organization in Egyptian Construction Market)
جامعة المنصورة
جامعة الاسكندرية
جامعة القاهرة
جامعة سوهاج
جامعة الفيوم
جامعة بنها
جامعة دمياط
جامعة بورسعيد
جامعة حلوان
جامعة السويس
جامعة المنيا
جامعة دمنهور
جامعة المنوفية
جامعة أسوان
جامعة جنوب الوادى
جامعة قناة السويس
جامعة عين شمس
جامعة أسيوط
شراقوة | الشرقية بين ايديك
اخبار الشرقية - شراقوة | الشرقية بين ايديك
جامعة كفر الشيخ
جامعة السادات
جامعة طنطا
جامعة بنى سويف